Before buying, developing or building, this guide helps you spot the signs of ecological issues: what you can read on maps, what you can observe on site and what needs an ecologist’s opinion.
The short answer
A site has biodiversity issues if it hosts, or could host, protected or threatened species, rare natural habitats, a wetland, or if it acts as an ecological corridor. To find out, work in three stages: (1) check public maps and databases, (2) look on site for habitats favourable to wildlife and plants, (3) have an ecologist confirm.
The first two stages take a few hours and cost nothing. They do not prove there are no issues, but they tell you whether a preliminary assessment is needed before you commit.
At a glance
A site does not need to be designated to have issues: a protected species can live on an ordinary plot outside any designated area.
Habitats matter more than size: an old hedgerow, a pond or an old building can concentrate most of a site’s issues.
No data does not mean no species: many private sites have never been surveyed.
The right time to check: before signing a purchase agreement or designing the site layout.
Step 1: What you can spot on maps
The main tools are free: Géoportail to overlay map layers, the INPN for designated sites and species, regional biodiversity data platforms and the map portals of the regional environment authorities (DREAL). The table below shows how to interpret each signal.
Also look at historical aerial photographs (“Remonter le temps” on Géoportail): a site left fallow for twenty years has often been colonised by interesting wildlife and plants.
Step 2: What to check on site
A one- to two-hour visit is enough to spot habitats that favour biodiversity. The aim is not to identify species, but to note what could support them.
A winter visit misses many signs (flowering, birdsong, amphibians). If possible, visit between April and June.
Step 3: When to bring in an ecologist
Commission a preliminary assessment (one to two days of fieldwork) as soon as any of these situations applies:
the site is in or near a designated area (Natura 2000, ZNIEFF, green and blue corridor);
you have spotted at least one of the signs in the table above;
the project is subject to an environmental procedure (screening, environmental impact assessment, water law);
the purchase or project is a major investment you want to secure.
The preliminary assessment will tell you whether the site has low, moderate or high issues, and which surveys would be needed. It is a modest cost compared with a blocked or late-redesigned project.
Quick grid: what level of alert?
Worked example: buying a 2-hectare plot
A local authority is considering buying a fallow plot to build a sports facility.
On the maps: no designation on the plot, but a green corridor in the local plan runs along its northern edge. Aerial photos show the land has been fallow for about fifteen years.
On site (in May): a dense hedgerow to the north, a small hollow holding water in spring, lizards seen on a pile of rubble.
Preliminary assessment: the ecologist confirms moderate to high issues linked to the hedgerow and the temporary pond, which suit protected amphibians and reptiles.
Decision: the authority buys the plot, but makes the programme conditional on a full assessment and plans from the outset to keep the hedgerow and pond in the design.
The most common mistakes
Concluding there are no issues because there is no designation.
Visiting the site only in winter and missing seasonal signs.
Clearing vegetation or felling trees before the study: this is often prohibited during the breeding season and can amount to destroying the habitat of protected species.
Waiting until the permit application to ask the question.
Frequently asked questions
How do I know whether a site is in a Natura 2000 area?
On Géoportail or the INPN website, by displaying the Natura 2000 layer. The map portal of your regional environment authority (DREAL) also shows these boundaries.
Does a ZNIEFF prevent building?
No, a ZNIEFF is an inventory, not legal protection. But it flags sensitive species and habitats that may themselves be protected, and the authorities pay close attention to these areas.
How do I know whether a site is a wetland?
Pre-mapping gives a first indication. Official classification relies on two criteria checked on site: vegetation and signs of waterlogging in the soil.
Can I clear a site before an ecological study?
It is best to wait. Clearing or felling trees during the breeding season can destroy the habitat of protected species, which is an offence, and it distorts the assessment.
How much does a preliminary ecological assessment cost?
Usually a few thousand euros excluding VAT for a desk study and one to two days of fieldwork, depending on area and region.
Further reading
Take stock of your project
Take stock of your project and the level of study you need. We help you read the data available for your site and decide whether a preliminary assessment is needed.